Case Study — Production Ops Automation · a garment manufacturer
A threshold trigger in a distance field
Each dot is a simulated production node — fabric arrivals, sample approvals, deliveries.
Time flows left. When a node drifts inside the look-ahead window, the system fires a reminder —
before it crosses zero.
Scheduled — still far out
In window — reminder sent
Overdue — escalating
Resolved — date backfilled